Remove 2007 Remove Contract Administration Remove Thresholds
article thumbnail

Government Contracts Issues for a Recession

Procurement Notes

3] The last eight recessions include the 2020 COVID-19 recession, the 2007-2009 Great Recession, the 2001 dot-com recession, the 1990-1991 savings & loan crisis recession, the 1981-1982 second double dip recession, the 1980 first double dip recession, 1973-1975 oil crisis recession, and the 1969-1970 guns and butter recession. [4]

article thumbnail

An In-Depth Examination of Inflation Relief for a Government Contractor

Procurement Notes

EPA Clauses The FAR If a contractor has a contract with a Federal Acquisition Regulation (“FAR”) Economic Price Adjustment (“EPA”) clause—which was designed to protect the Government and the contractor from cost fluctuations—then at least a partial remedy should be available through that clause. [17] See, e.g., CESC Plaza Ltd.