KluwerArbitration ITA Arbitration Report, Volume No. XXII, Issue No. 3 (March 2023)
Kluwer Arbitration
MAY 2, 2024
The previous ones referred to a preliminary measure (2010) and to an annulled arbitral award (2011). In both arbitrations, Lima responded by arguing among other things that the Concession Contract and its modifications were void due to corruption. 19,971 in 2004 that the Supreme Court of Chile has denied an exequatur.
Let's personalize your content