Remove 2014 Remove Collusion Remove Demand
article thumbnail

Countdown to RIDW2024: Acceleration of Construction Projects

Kluwer Arbitration

The additional cost of accelerative measures taken in response to legitimate demands by an employer for the contractor to pick up the pace of works will typically be unrecoverable. Hydro-Québec, 2014 QCCA 948. Hydro-Québec, 2014 QCCA 948. Probuild [2021] VSC 849.

article thumbnail

Public procurement (entry for an Encyclopaedia)

How to Crack a Nut

I will not focus on the detail of procurement rules, which is better left to in-depth analysis (eg Arrowsmith [2014] and [2018] , Steinicke and Vesterdorf [2018] , or Caranta and Sanchez-Graells [2021] ). Regulation in the EU and the UK , vols 1 & 2 (3rd edn, Sweet & Maxwell 2014 and 2018).