Remove 2016 Remove Bidder Remove Quantity
article thumbnail

The Bid Evaluation Process

The Procurement ClassRoom

Generally, evaluation criteria can be categorized into three categories including (i) mandatory criteria, (ii) weighted criteria and (iii) weighted criteria with mandatory elements (UNDP, 2016). A price reasonableness analysis is also done to ascertain that the price of the recommended bidder is fair given the prevailing market conditions.

article thumbnail

An In-Depth Examination of Inflation Relief for a Government Contractor

Procurement Notes

60] Similarly, what the contractor provides as consideration should, if possible, not be a substantial change to work type or quantity. Jones was not, to stand aside and let the bidder be overwhelmed without a warning.” [134] Obviously, the bigger and more multi-faceted the contract, the more flexibility is afforded.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

GAO Bid Protests: Required Debriefings

Procurement Notes

The plain meaning of § 3553(d)(4)(A)(ii) is that the clock starts on the day that the bidder receives debriefing. B-412729 , 2016 CPD ¶ 88, at 2-3 (Mar. 14, 2016); Loc Performance Products, Inc., It follows that ‘the debriefing date’ here, under the statute, is March 6, 2020—the last day of NIKA’s debriefing process.” [59]

Bidding 40
article thumbnail

Not All Piggyback Contracts Are Created Equal

Mike Purdy's Public Contracting

Did they bid roughly the same quantity you need? Did they award to the lowest bidder? April 6, 2016, Television Interview with Mark Maxwell Could Kasich or Cruz Win At Contested Convention? April 27, 2016, Television Interview with Mark Maxwell Can the GOP Still Dump Trump? Did they receive more than one bid?

Contract 100