Remove 2019 Remove Freight Remove Quality
article thumbnail

KluwerArbitration ITA Arbitration Report, Volume No. XXII, Issue No. 6 (June 2022)

Kluwer Arbitration

Later, the Respondent refused to pay for the goods, since a substantial part of the goods received by the Respondent were of poor quality (rotten). PI5251-23, 20 October 2023 Elizaveta Mikaelyan, RAC, ITA Reporter for the RAC A dispute from a forwarding contract for a freight transportation organization. Contractor v. Claimant v.

Freight 52
article thumbnail

Another possible challenge for DoD’s $19B moving contract: No movers

Federal News Network

“HomeSafe’s pricing was bid in 2019, and we’ve seen a lot of inflation in our industry. We’d be paid less than we were being paid in 2019, and then you add on all these costs, and there’s just not enough dollars.” “TRANSCOM takes that as a threat, but it’s not as though we don’t want to do the work. I’m a military mover.

Contract 119
article thumbnail

An In-Depth Examination of Inflation Relief for a Government Contractor

Procurement Notes

” [5] Iron ore prices are down from 2021, but still above 2015-2019 averages. “In B-417796, 2019 CPD ¶ 397 (Oct. however, the prices for products that go into nonresidential structures and other construction projects are still up 16.7%, [American Builders and Contractors] said.” percent from June 2021 to June 2022.