article thumbnail

GAO’s Annual Bid Protest Report:  Protest Filings and Sustain Rate Soar

Inside Government Contracts

The sustain rate increased from 13% to 31%. For each of the past four years, the sustain rate has alternated between 13% and 15%. That significant increase was due to the 119 protests that GAO sustained related to the CIO-SP4 GWAC (decisions available here and here ). This year, however, it shot up to 31%.

article thumbnail

Mastering How to Get Government Contracts

Select GCR

Trying to figure out how to get a government contract? This no-nonsense guide walks you through the contracting process, from initial eligibility to bidding, and ultimately enables your small business to win contracts available every fiscal year. You’re in the right place!

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Government Contracting in State and Local Markets

Select GCR

State and local governments often look for suppliers to provide a wide range of goods, including office supplies, equipment, vehicles, and technology. Additionally, there are unique chances in specific areas such as renewable energy, sustainability, and community development projects.

article thumbnail

Two Bites of the Same Apple: Protester Wins Sustain on Second Name Brand or Equal Protest with an Unexpected Result

SmallGovCon

This is essentially Federal Government Contracting 101 and applies to any type of solicitation. Though the decision mentions additional requirements that West’s product did not offer, discussion of the salient characteristics stopped there because it was enough to warrant a sustain on that basis. In RELX, Inc.,

article thumbnail

60-Second Sustains: American Material Handling, Inc.

Government Contracts Navigator

422171 The post 60-Second Sustains: American Material Handling, Inc. appeared first on Government Contracts Navigator. Elizabeth N. Jochum ● American Material Handling, Inc.B-422171

article thumbnail

60-Second Sustains: SierTek-Peerless JV LLC

Government Contracts Navigator

The post 60-Second Sustains: SierTek-Peerless JV LLC appeared first on Government Contracts Navigator. Elizabeth N. Jochum ● SierTek-Peerless JV LLCB-422085, B-422085.2

article thumbnail

2024 GAO Bid Protest Report: Numbers Down, Effectiveness Still Even Odds

SmallGovCon

Here are some key points from this year: (1) the key effectiveness metric, showing numbers of sustains and corrective actions at GAO, was similar to prior years at 52% for the 2024 fiscal year and (2) total bid protest numbers were down slightly from 2023 but a little above the number for 2022. Why Are Cases Sustained?

Bidding 59