Remove Presentation Remove Price Remove Thresholds
article thumbnail

Bid Protest Minute: GAO’s Task Order Jurisdiction

GovCon & Trade

One would think the $25 million threshold applicable to protests of DOD task orders (the threshold is $10 million for civilian agency task orders) would be easily understood and simple to apply. The protestor’s proposed price was $30,478,050, and its total evaluated price was $30,566,297. 4106(f)(1) and 10 U.S.C.

Bidding 147
article thumbnail

Multiple Award Schedule (MAS) Pricing Paradoxes

The CGP

“Fair and Reasonable” MAS contract level pricing is impacted by a host of factors. Contracting officers must assess, analyze, and apply these factors when reviewing an offeror’s proposal and negotiating fair and reasonable pricing. Previous FAR & Beyond blogs regarding this topic can be found here and here.

Price 100
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

VOSB Program Possibly Expanding? Congress Takes Next Step Towards VOSB Expansion

SmallGovCon

As noted above, at the present time, only the VA can set aside prime contracts for VOSBs. On top of this, it also would allow DoD contracting officers to sole source contracts to VOSBs if the contracts are below certain dollar thresholds. This new provision would also set up a VOSB contracting goal for DoD.

Contract 105
article thumbnail

UK: start of the public consultation on the introduction of a UK carbon border adjustment mechanism (CBAM)

Import and Trade Remedies

To achieve this it will impose a carbon price on imported goods with the aim of levelling the playing field and ensuring that imported goods are subject to a carbon price that is comparable to that incurred by manufacturers based in the UK. The CBAM proposal forms part of the UK government’s wider strategy to tackle carbon leakage.

article thumbnail

The Cost Corner: Government Contracts Cost and Pricing – Compensation for Personal Services (Part I)

Government Contracts & Investigations

Welcome back to the Cost Corner, where we provide practical insight into the complex cost and pricing requirements that apply to Government contractors. In fact, the Government frequently concedes when presented with these and other rational challenges to DCAA’s methodology for evaluating reasonableness. DCAA, DCAM ¶ 6-413.1.c.

Price 52
article thumbnail

Navy’s journey to new procurement system remains in peril

Federal News Network

30, 2026, according to a 2020 memo from Kim Herring, the then-acting principal director of the Office of Defense Contract and Pricing. It’s typically called out in the request for proposals that there will be a past performance, a technical assessment and evaluation of price and volume.

article thumbnail

Navigating the 5 Steps of the Procurement Journey Part 2

The Procurement School

The presentation and all questions and answers are posted as an addendum in keeping with the public procurement tenets of open, fair and transparent. The evaluation can be simple, such as tenders which are price only, or complex which includes technical criteria, pricing and sometimes an interview or demonstration.

Bidder 52